ROUTE AND TRACK KILOMETRES

 

       Division

ROUTE KILOMETRES

TRACK KILOMETRES

Broad Gauge

Narrow Gauge

Total

Broad Gauge

Narrow Gauge

Total

 

Adra

603.270

     0.00

603.270

1857.054

       0.00

1857.054

Chakradharpur

753.190

     0.00

753.190

2199.420

        0.00

2199.420

Kharagpur

584.766

37.360(+)

622.126

1863.001

38.00(+)

1901.001

Ranchi

374.740

69.150(+)

443.89

643.500

80.03(+)

723.53

TOTAL

2315.966

106.510(+)

2422.476

6562.975

118.03(+)

6681.005

 

(+) All narrow gauge lines are being converted to Broad Gauge.

 

STATE-WISE ROUTE & TRACK KILOMETRES 

 

STATE

ROUTE KILOMETRES

TRACK KILOMETRES

Broad Gauge

Narrow Gauge

Total

Broad Gauge

Narrow Gauge

Total

 

Jharkhand

884.801

69.150

953.951

2578.557

80.03

2658.587

Orissa

537.230

37.360

574.590

1459.894

38.00

1497.894

West Bengal

893.935

0.00

893.935

2524.524

0.00

2524.524

TOTAL

2315.966

106.510

2422.476

6562.975

118.03

6681.005

 

 

 

 

 

Electrified Route Kilometres.

2137.318

 

Level Crossings : 

 

Mechanical  Workshops

Kharagpur, Adra,

 

Manned

415

Engineering Workshops

Sini, Jharsuguda

 

Unmanned

1092

Signalling Workshop

Kharagpur

 

Total

1507

Diesel Loco Sheds

Kharagpur, Bondamunda and Bokaro.

 

 

 

Staff

 

Electric Loco Sheds

Tata, Bondamunda and Santragachi

 

 

(Gr. C+ D)         Sanctioned

108328

Electrical Multiple Unit (EMU) Car Sheds

Tikiapara and Panskura.

 

 

 

 

On Roll

 

95198

Holding of Locomotives

 

280

 

 

Officers             Sanctioned

 

692

 

                  Diesel    :

                  Electric  :

308

 

On Roll

610

Stores Depot

Kharagpur.

 

 

 

Stations :

 

 

 

 

 

A Class

    7

 

 

 

 

B Class

    4

 

 

 

 

C Class

  27

 

 

 

 

D Class

    9

 

 

 

 

Others

254

 

 

 

 

Total

301

 

 

 

 

 

 

 

 

   

 

PERFORMANCE OF PRESENT SE RAILWAY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

FINANCIAL PERFORMANCE

 

 

 

Item

 

 

2003-04

2003-04

2004-05

Actuals

Actuals

(Upto Jan. 04)

Target for the Year

Prop. Target (Apr.-Oct.)

Approx Actuals

(April 04  - Jan 05.)

Originating Earnings

(in Crores of Rupees)

 

Passenger

458.38

378.82

484.00

400.00

416.22

Goods

2663.85

2181.57

2730.36

2261.73

2447.57

Others

82.33

57.71

90.43

66.42

56.67

Total

3204.56

2618.10

3304.79

2728.15

2920.46

 

Working Expenses

(In Crores of Rupees)

 

Gross Working Expenses

1651.26

1687.45

1913.35

1694.73

1633.66

Appropriation to Depreciation Reserve Fund

125.59

93.33

111.00

92.50

92.50

Appropriation to Pension fund

416.72

338.19

419.16

349.30

349.30

Total Working Expenses

(Excluding suspense)

2193.57

2118.97

2443.51

236.53

2075.46

 Suspense

-2.52

15.66

- 2.00

19.65

707.23

Total Working Expenses

2191.05

2134.63

2441.51

2156.18

20.82

Surplus

1048.83

524.75

904.46

631.20

707.23

Operating Ratio (in % age)

81.24

95.79

86.72

91.86

88.66

 

  

 

FREIGHT OPERATION

 

 

Commodity wise loading figures for the last three years are given below :-

 

 

Commodity

Yearly Figures

(April 04 – January 05)

2002-03

2003-04

2003-04

2004-05

Loading

(In Million Tonnes)

Loading

(In MT)

Earnings

 (In Crs.of Rs)

Loading

(In MT)

Earnings

 (In Crs.of Rs)

1

Total Coal

16.68

17.67

14.56

532.83

14.62

569.55

2

Raw Material to Steel Plants

21.19

21.82

17.95

355.46

17.06

356.79

3

Finished Product from Steel Plants

6.25

6.73

5.49

592.57

5.55

625.87

4

Export Ore

1.41

4.74

3.93

137.28

5.49

219.26

5

Cement

3.39

3.56

2.74

94.61

3.43

122.53

6

Food grains

0.22

0.06

0.05

1.45

0.13

3.36

7

Fertilizers

0.59

0.52

0.46

18.82

0.27

9.26

8

Petrol Oil Lubricants

1.69

1.40

1.12

79.15

1.32

104.37

9

Others General Goods

11.65

12.65

10.40

369.40

12.02

436.58

 

TOTAL REVENUE

63.07

69.15

56.70

2181.57

59.89

2447.57

 

 

During last 10 months SE Railway loaded 59.89 Million Tonnes revenue traffic, which is 3.19 Million Tonnes more than the corresponding period of last year and 1.14 Million Tonnes more than the proportionate target.

 

 

Efficiency indices in the current year as compared to previous year are detailed below:-

 

Sl.No.

Indices

(April 04 – January 05)

2003-04

2004-05

1

Wagon Holding

45820

47467

2

Diesel Loco Utilisation

410

407

3

Electric Loco Utilization

420

429

4

Wagon Turn Round

3.00

2.97

5

Wagon KM / Wagon day

157.7

150.

6

NTKM/Wagon day

2409

2305

 

 

PASSENGER SERVICES

 

 

Introduction of New Trains

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

PASSENGER AMENITIES

 

 

 

Model Stations 

 

Text Box:           Irrespective of categorization, some of the stations have been designated as Model Station. Depending on their categories, additional facilities have been envisioned for them. In South Eastern Railway the following 21 stations have been designated as Model stations.
 

 

 

 

 

 

 

 

 

 

 

 

 

Modernisation of Enquiry SystemText Box: COMPUTERISATION OF COMPLAINTS AND ENQUIRIES
Handling of complaints and enquiries have been computerized at the following 7 major stations : 
 
In addition to these stations, all the Divisional Head Quarters Offices as well a Zonal Head Quarters have been networked through e-mail for expeditious remedial action on complaints etc. The Global Enquiry system is able to provide passengers with upto date data regarding routes, fares, choice of trains etc. and at a later date will also provide current status of train running.     

 

 

 

 

 

 

 

 

 

 

 

 

 

Text Box:  NATIONAL TRAIN ENQUIRY SYSTEM (NTES)
Apart from feeding terminals at 4 divisional control offices, enquiry terminals are available at the following 8 main enquiry offices under National Train Enquiry System (NTES). 
 
It is proposed to set up National Train Enquiry System at Ranchi, Baleswar and Bokaro Steel City.       
Improvements in Pasenger Information ServiceText Box: INTERACTIVE VOICE RESPONSE SYSTEM (IVRS)
Interactive Voice Response System (IVRS) which prompts the person and gives specific information about train running or status of reservation provided at the following 9 stations:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Text Box: COMPUTERISED PASSENGER COACH GUIDANCE SYSTEM
Computerisation of Passenger Coach Guidance System :- A computerized Passenger Coach Guidance System has been developed and installed at the South Eastern Railway terminal of Howrah, Ranchi and Kharagpur (PF-5,6)  and Tatanagar(PF-1,3) stations. In this system, the position of various coaches of the trains standing at the platforms can be indicated through LED displays controlled from a PC. The display indicates coach position of both outgoing and incoming trains. The system has been highly appreciated by the travelling public. A work has been sanctioned and is in progress for provision of similar computerized passenger coach guidance system at Tatanagar and Rourkela stations.

 

 

 

 

 

 

 

 

 

  

Text Box: ELECTRONIC TRAIN INDICATION BOARDS 
Electronic Train Indication Boards are available at following 11 stations: -

 

 

 

 

 

Text Box: RESERVATION AVAILABILITY POSITION INDICATION DISPLAY (RAPID)
Reservation Availability Position Indication Display (RAPID) boards interconnected with Computerized Reservation System is available at Reservation Office. Work for provision of such boards for two more stations i.e. Tatanagar and Ranchi is under progress. 
Text Box: COMPUTERISED   RESERVATION   COUNTERS 
Computerized   Reservation   counters are   now   available   at   the   following   46 locations/ satellite offices on South Eastern Railway : - 
Text Box: GLOBAL NETWORKING 
Global Networking between all Passenger Reservation Systems on Indian Railway has been introduced since March 1999. By this, it is possible to have universal computerized reservation counters where passengers can book tickets from any place to any other place on Indian Railways without any restriction. 
Text Box: TATKAL SCHEME OF TRAIN RESERVATION 
For genuine/needy passengers who could not reserve their accommodation well in advance, South Eastern Railway has introduced Tatkal Sewa (Instant reservation) by all PRS trains in all classes. Tatkal reservation starts one day in advance of the date of journey and is issued to the passengers at the following premium over and above the normal fare.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PROJECTS