|
CE’s Circulars No. |
Date |
Subject |
|
101 |
16.11.89 |
Track machines |
|
102 |
28.02.90 |
Yards and crossing stations |
|
103 |
10.08.90 |
Gang strength |
|
104 |
27.06.90 |
Unmanned level xing |
|
105 |
24.03.90 |
Prevention of rail and fractures |
|
106 |
20.09.90 |
Welding of VIC Gr.A (90 UTS) Rail |
|
107 |
01.10.90 |
Strengthening of track in approaches of all Major/important bridges on B.G. |
|
108 |
1990 |
Track Drainage |
|
109 |
06.11.90 |
Safety precarsion at worksite |
|
110 |
|
Rail joints-Fishplated, welded and shed |
|
111 |
29.01.91 |
Use of single coil spring washers in track |
|
112 |
13.02.91 |
The standard practice of key driving in different types of sleepers |
|
113 |
19.02.91 |
Monitoring of track Geometry and ride quality |
|
114 |
25.03.91 |
Working of rail dollies |
|
115 |
30.04.91 |
Formation width standards for |
|
116 |
21.05.91 |
Jt. Traffic & Engg. Circular reg. Traffic blocks |
|
117 |
05.06.91 |
Utilisation of steel through sleeper of straight switch trun-outs in curved
switch layouts of Turnouts |
|
118 |
28.08.91 |
Demarcating & verification of Rly. Boundries & maintenance of records |
|
119 |
|
not issued |
|
120 |
16.10.92 |
Test checks on measurement and quality ballast |
|
121 |
09.05.94 |
Track laying quality control and handing/taking over bet. Maintenance unit
and construction of Track renewal units |
|
122 |
30.05.94 |
Track Drainage |
|
123 |
07.06.94 |
Demanning of existing manned level crossing |
|
124 |
07.07.94 |
Construction at New un-manned level crossings |
|
125 |
08.07.94 |
O' Missing Fittings Gang |
|
126 |
21.07.94 |
Contracts for miscellaneous Track works |
|
127 |
07.02.95 |
Gang charts and diaries Books |
|
128 |
07.02.95 |
Duties of Keyman |
|
129 |
10.02.95 |
Incresase of Speed on Turnout and loop lines to 30 Kmph |
|
130 |
09.06.95 |
Pre-monsoon works & Monsoon precaution |
|
131 |
21.08.95 |
Instruction in connection with the submission of Br. Inspection registers
contained in CE's circular No.96 at 1987 |
|
132 |
21.09.95 |
Working of Push Trollies and lorries |
|
133 |
28.02.96 |
Recording of Rail Temperature |
|
134 |
26.03.96 |
Periodical examination of Motor Trolley |
|
135 |
01.05.96 |
Contracts for miscellaneous Track works |
|
136 |
25.07.96 |
Inspection of track by window Trailing/foot plate by AEN, DEN/Sr.DEN on this
section |
|
137 |
04.03.98 |
Directed maintenance of building |
|
138 |
25.03.98 |
Procedure for accountal & disposal of released (SH-scrap) track materials |
|
139 |
24.03.98 |
Inspection of structural steel & timber works by AEN & IOWs |
|
140 |
25.03.98 |
Maintenance and cleaning of water storage tanks |
|
141 |
29.04.98 |
Oiling & greasing of SEJs |
|
142 |
09.07.98 |
Restriction to be imposed at the site of TRT working |
|
143 |
09.07.98 |
Utilisation of damaged PSC sleeper |
|
144 |
09.07.98 |
Attention to track at work spot |
|
145 |
31.07.98 |
Visibility requirement along the track for road users at unmanned LCs |
|
146 |
12.08.98 |
Granting of way leave facilities/easement right policy regarding |
|
147 |
19.08.98 |
Test check of ballst measurements to be carried out by Sr.DENs/DENs
in-charge of the section |
|
148 |
20.10.98 |
Track renewal proposal for works programme |
|
149 |
10.11.98 |
Issue of OES caution order |
|
150 |
24.12.98 |
Track works requiring block/speed restriction |