LIST OF CE CIRCULARS (151-200)

CE’s Circulars No. Date Subject
151 28.01.99 Greasing of rail gauge-face on curves
152 1.01.99 Project report for track renewal works
153 18.01.99 Use of spring setting devices (SSD) on curved switches
154 22.02.99 Joint procedure order on sanitation of stattions and railway colonies (for cleanliness)
155 10.02.99 Negotiation in works tender

156

156 (Revised)

04.02.99

06.12.07

Greasing of ERC and measurement of toe load of ERC

Greasing of ERC and measurement of toe load of ERC

157 12.04.99 Protection of AT welds
158 19.02.99 Procedure order for detection, prevention & removal of encroachment of Railway land in S. E. Railway
159 18.02.99 Display of station name at stations
160 31.03.99 Formation of colony care committee
161 03.10.99 Execution of P.Way work through contractual agency
162 03.12.99 Re-organisation of track machine organisation
163 22.06.99 Screening of Ballast
164 22.10.99 Procedure of execution of deep screening
165 04.05.99 Maintenance of concrete sleeper track
166 23.04.99 Guidelines for dealing with cases on licensing of Railway land for short duration
167 23.04.99 ESO No.1, Policy of issue of ESOs
168 23.04.99 ESO No.2, Lebel crossing, ROB and RUB
169 23.04.99 ESO No.3, Procurement of rails, rail fracure & USFD
170 23.04.99 ESO No.4 on siding matters
171 23.04.99 ESO No.5, Procurement of sleepers & fittings
172 23.04.99 ESO No.6, Track machines & track monitoring
173 23.04.99 ESO No.7 Not issued
174 23.04.99 ESO No.8, On Metropolitan Transport Project
175 23.04.99 ESO No.9, On negotiations
176 23.04.99 ESO No.10, On contract policy
177 23.04.99 ESO No.11, on Passenger Amenities
178 23.04.99 ESO No.12, Compendium of instructions on Rest Houses, Schools, water supply, Housing 
179 10.05.99 Submission and scrutiny of AENs Bridge inspection register
180 15.06.99 Training of Gangmen, Mate, Keymen and Gatemen in Divisional Engineering Training School
181 06.07.99 Unloading and stacking of P.Way material on cess avoiding of infringement
182 06.07.99 Inspection of vulnerable cutting & water way of bridges prior to Monsoon, certificate regarding
183 15.07.99 Yardsticks for small machines with in-charge PWIs
183A (Revised) 04.04.08 Yardsticks for small machines
184 15.07.99 Yardsticks for Engg. Material in Accident Relief Trains
185 06.08.99 Procedure order for executing track renewal work by independent w/c PWI (Track laying unit)
186 16.08.99 Provision of short check rail ahead of toe of switches in points & x-ing on curve
187 25.08.99 Distribution of important circulars, correction slip to manuals etc.- Assurance register
188 25.08.99 Restriction to imposed at the site of TSR work with PSC sleeper by PQRS
189 25.08.99 Placing of temporary Engg. Indicators in case of mulitiple restriction at track renewal works
190 07.10.99 PVC pipes fpr plumbing in corrosion-prone areas
191 11.10.99 Prevention of corrosion in the steel members of foot over bridges, steel trestles and columns of PF
192 08.10.99 Guidelines for the quality control and chlorination of water for drinking and domestic use
193 22.10.99 Water proofing of building & structures
194 09.11.99 Compendium of instructions on railway land leasing, licensing, encroachment, afforestations
195 11.11.99 Management of zonal contract (p.Way), delay finalisation of zonal tender
196 12.11.99 Location of derailing switches
197 01.12.99 Compendium of accidents
198 03.12.99 Painting of rail and weld collar
199 31.12.99 Water storage tank in the coastal area
200 01.01.00 Master revision circular deletion of earlier CE's circulars