| CE’s
Circulars No. |
Date |
Subject |
| 151 |
28.01.99 |
Greasing
of rail gauge-face on curves |
| 152 |
1.01.99 |
Project
report for track renewal works |
| 153 |
18.01.99 |
Use
of spring setting devices (SSD) on curved switches |
| 154 |
22.02.99 |
Joint
procedure order on sanitation of stattions and railway colonies (for
cleanliness) |
| 155 |
10.02.99 |
Negotiation
in works tender |
|
156
156
(Revised)
|
04.02.99
06.12.07
|
Greasing
of ERC and measurement of toe load of ERC
Greasing
of ERC and measurement of toe load of ERC
|
| 157 |
12.04.99 |
Protection
of AT welds |
| 158 |
19.02.99 |
Procedure
order for detection, prevention & removal of encroachment of
Railway land in S. E. Railway |
| 159 |
18.02.99 |
Display
of station name at stations |
| 160 |
31.03.99 |
Formation
of colony care committee |
| 161 |
03.10.99 |
Execution
of P.Way work through contractual agency |
| 162 |
03.12.99 |
Re-organisation
of track machine organisation |
| 163 |
22.06.99 |
Screening
of Ballast |
| 164 |
22.10.99 |
Procedure
of execution of deep screening |
| 165 |
04.05.99 |
Maintenance
of concrete sleeper track |
| 166 |
23.04.99 |
Guidelines
for dealing with cases on licensing of Railway land for short
duration |
| 167 |
23.04.99 |
ESO
No.1, Policy of issue of ESOs |
| 168 |
23.04.99 |
ESO
No.2, Lebel crossing, ROB and RUB |
| 169 |
23.04.99 |
ESO
No.3, Procurement of rails, rail fracure & USFD |
| 170 |
23.04.99 |
ESO
No.4 on siding matters |
| 171 |
23.04.99 |
ESO
No.5, Procurement of sleepers & fittings |
| 172 |
23.04.99 |
ESO
No.6, Track machines & track monitoring |
| 173 |
23.04.99 |
ESO
No.7 Not issued |
| 174 |
23.04.99 |
ESO
No.8, On Metropolitan Transport Project |
| 175 |
23.04.99 |
ESO
No.9, On negotiations |
| 176 |
23.04.99 |
ESO
No.10, On contract policy |
| 177 |
23.04.99 |
ESO
No.11, on Passenger Amenities |
| 178 |
23.04.99 |
ESO
No.12, Compendium of instructions on Rest Houses, Schools, water
supply, Housing |
| 179 |
10.05.99 |
Submission
and scrutiny of AENs Bridge inspection register |
| 180 |
15.06.99 |
Training
of Gangmen, Mate, Keymen and Gatemen in Divisional Engineering
Training School |
| 181 |
06.07.99 |
Unloading
and stacking of P.Way material on cess avoiding of infringement |
| 182 |
06.07.99 |
Inspection
of vulnerable cutting & water way of bridges prior to Monsoon,
certificate regarding |
| 183 |
15.07.99 |
Yardsticks
for small machines with in-charge PWIs |
| 183A
(Revised) |
04.04.08 |
Yardsticks
for small machines |
| 184 |
15.07.99 |
Yardsticks
for Engg. Material in Accident Relief Trains |
| 185 |
06.08.99 |
Procedure
order for executing track renewal work by independent w/c PWI (Track
laying unit) |
| 186 |
16.08.99 |
Provision
of short check rail ahead of toe of switches in points & x-ing
on curve |
| 187 |
25.08.99 |
Distribution
of important circulars, correction slip to manuals etc.- Assurance
register |
| 188 |
25.08.99 |
Restriction
to imposed at the site of TSR work with PSC sleeper by PQRS |
| 189 |
25.08.99 |
Placing
of temporary Engg. Indicators in case of mulitiple restriction at
track renewal works |
| 190 |
07.10.99 |
PVC
pipes fpr plumbing in corrosion-prone areas |
| 191 |
11.10.99 |
Prevention
of corrosion in the steel members of foot over bridges, steel
trestles and columns of PF |
| 192 |
08.10.99 |
Guidelines
for the quality control and chlorination of water for drinking and
domestic use |
| 193 |
22.10.99 |
Water
proofing of building & structures |
| 194 |
09.11.99 |
Compendium
of instructions on railway land leasing, licensing, encroachment,
afforestations |
| 195 |
11.11.99 |
Management
of zonal contract (p.Way), delay finalisation of zonal tender |
| 196 |
12.11.99 |
Location
of derailing switches |
| 197 |
01.12.99 |
Compendium
of accidents |
| 198 |
03.12.99 |
Painting
of rail and weld collar |
| 199 |
31.12.99 |
Water
storage tank in the coastal area |
| 200 |
01.01.00 |
Master
revision circular deletion of earlier CE's circulars |