| CE’s
Circulars No. |
Date |
Subject |
| 201 |
01.01.00 |
Layout
plans of distribution system in connection with water supply in
Railway complex |
| 202 |
24.01.00 |
Inspection
of over-head steel structures across the track erected by
non-railway organisations |
| 203 |
25.01.00 |
Opening
of tenders |
| 204 |
11.02.00 |
Bridge
inspection by AENs-Quarterly monitoring of compliance |
| 205 |
06.04.2000 |
Train
operation during fog-line marking access track at sighting broad
during winter. |
| 206 |
10.04.2000 |
Joint
procedure order on single line working for Engg. Block in double
line Sec. |
| 207 |
05.05.2000 |
Keyman’s
daily Track Patrolling. |
| 208 |
05.05.2000 |
Laying
of PRC Fan shaped Turnouts. |
| 209 |
25.05.2K |
Maintenance
of Pvt. Sidings. |
| 210 |
20.07.2000 |
Measurement
of distilling works on rider bed. |
| 211 |
25.07.2K |
River
& Flood Register. |
| 212 |
02.08.2000 |
Supply
of drinking water to the traveling public at Railway stations. |
| 213 |
19.09.2000 |
Working
of temping machine in design mode. |
| 214 |
28.09.2000 |
Safety
at work site. |
| 215 |
10.10.2000 |
Maintenance
of Stores Records in the units of Sr. Subordinates in the Civil
Engineer Department. |
| 216 |
06.11.2000 |
Inspection
of Flood, Light Towers. |
| 217 |
22.11.2000 |
Works
Programme proposal. |
| 218 |
27.11.2000 |
Preparation
of drawing for execution Civil Engineering Works. |
| 219 |
29.11.20000 |
Taking
over of new assets from the construction organization. |
| 220 |
12.02.2001 |
LWR
Plans. |
| 221 |
08.03.2001 |
Quality
of Channel Sleepers. |
| 222 |
08.03.2001 |
Earthquake
resistance building & structure. |
| 223 |
25.04.2001 |
Rail
renewal on major and important Bridges |
| 224 |
02.11.2001 |
Inspection
maintenance and replacement of cast Iron Helical Staircases. |
| 225 |
05.11.2001 |
Durability
of plain and Reinforced Cement Concrete Structures. |
| 226 |
06.11.2001 |
Inter
divisional movement of Track Machines. |
| 227 |
06.12.2001 |
Use
of croqueted Aluminum roofing shuts. |
| 228 |
01.01.2002 |
Design
on Buildings structure |
| 229 |
5/18.02.2002 |
Corrective
measures for continuing defective welds in track. |
| 230 |
25.2.2002. |
Guide
lines for dealing with case granting of way leave facilities/croachment
rights on Railway land. |
| 231 |
22.02.2002 |
Destressing
of LWR on PSC Sleeper at lower temperature for reduce weld failures. |
| 232 |
02.03.2002 |
Inspection
of Bridges by Sectional Sr. DEN/DEN. |
| 233 |
18/26.03.02 |
Management
of Tenders and contracts in Division. |
| 234 |
04.04.2002 |
Protecting
at welds by providing joggled fishplates in the approaches of major
bridges. |
| 235 |
08.04.2002 |
Prevention
of seizure/corrosion of ERC. |
| 236 |
11.04.2002 |
End
cropping and welding of Rails. |
| 237 |
14.05.2002 |
Annual
confidential Report of Contractors. |
| 238 |
12/18.06.02 |
Visual
Examination fish plate/welds rail joints and other weak cushions in
rail. |
| 239 |
24.06.2002 |
Safety
precarsion at worksite in proximity to running track. |
| 240 |
12/15.07.02 |
Procedure
order for detection, prevention & removal of encroachment of
Railway land in S. E. Railway |
| 241 |
18.07.2002 |
TGI
Value. |
| 242 |
17.10.2002 |
Inspection
and maintenance of steel Channel sleepers laid on girder Bridges. |
| 243 |
19.03.2003 |
Monitoring
and analysis of Rail/Weld fractures. |
| 244 |
20.3.2003 |
Inspection
of breathing length & SEJ on LWR by Sr.DEN/DENs of the section
AND Recording of Fractures and cuts in LWR alongwith Rail
Temperatures |
| 245 |
1/5.04.2003 |
Special
Pay to Gatekeepers of Engineering Department |
| 246 |
11.07.2003 |
Prevention
of Accidents at Work Sites |
| 247 |
29.07.03 |
Inspection
of Cross Over |
| 248 |
06.08.2003 |
Department
Welder wise performance for Alumino-Thermic welding |
| 184A |
18.09.2003 |
Preparedness
for restoration of track after accidents |
| 249 |
18.12.2003 |
Metallisation
of flooring system of open web girders and foot over bridges |
| 250 |
05.05.2004 |
Installation
of Hectometer post along the track |