|
CE’s Circulars No.
|
Date
|
Subject
|
|
251
|
16.07.2004
|
Speed Breaker with correct
geometry of raod surface at Level Crossing
|
|
252
|
09.11.2004
|
Handing over & Taking over
notes of SE/P.Way
|
|
253
|
08.08.2005
|
USFD Testing of Rails and welds
|
|
254
|
27.07.2005
|
Provision of Road sign Boards at
approaches of all unmanned and manned level crossing
|
|
255(Revised)
|
08.08.2005
|
Issue of "Permit To
Work" to contractors engaged in P.Way work
|
|
256
|
25.08.2005
|
Action plan for improving TGI
value in 'A' & 'B' routes of S.E.Railway
|
|
257
|
24.05.2006
|
Re-organisation
of track machine organisation
|
|
258
|
June'2006
|
Maintenance of road surface at
level crossings.
|
|
259
|
03.07.2006
|
Painting of rail and weld collar
|
|
260
|
06.12.2007
|
Greasing of rails on curves and
ER clips
|
|
261
|
10.12.2008
|
Renewal/Replacement Planning of
CMS Crossings
|
|
262
|
11.02.2009
|
Prevention of Corrosion of rails
and welds
|
|
263
|
10.07.2009
|
Flood records and soundings
during floods
|
|
264
|
Aug’09
|
Reduction of A.T. Welds on run
through lines
|
|
265
|
06.10.2009
|
Inspection Schedule for End
checking of single rail, tolerances of welded joints, M&C test.
|
|
266
|
15.02.2010
|
Inspection Track Machine
|
|
267
|
18.02.2010
|
Quality Control and traceability
of Glued Joints on the track
|