SOUTH EASTERN RAILWAY
[Office
of the Divisional Railway Manager (Engg), Kharagpur]
SEPARATE SEALED TENDERS ARE INVITED FOR EXECUTION OF THE FOLLOWING WORKS IN KHARAGPUR
Click to download
Tender
Notice No.
T/PUB/2010/15
dtd. 02. 03.2010.
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
1. |
Execution of various passenger amenity works like Provision/ Repairs of new standard type FOB/ Landing, improvement of circulating area, Booking area, P.F. surfacing / raising etc. at Kolaghat, Bauria, Andul, Changail, Panskura, Uluberia & Mourigram stations under Sr.DEN/East/KGP section. |
3,94,36,992/- |
3,47,190/- |
10,000/- |
25.03.2010. |
Click to download
Tender
Notice No.
T/PUB/2010/14
dtd. 26.02.2010.
|
Sl.
No. |
Description
of work |
Approx.
Value (Rs) |
Earnest
Money (Rs.) |
Cost
of Tender Form. |
Date
of opening. |
|
1 |
Fortification of Armoury located in the office of Sr.DSC/RPF/KGP at
Kharagpur. |
24,70,804/- |
49,420/- |
3,000/- |
01.04.2010 |
|
2 |
Construction of 4 Nos. of Class room and Recreation room at RPF Zonal
Training Institute/ Kharagpur. |
24,43,041/- |
48,870/- |
3,000/- |
01.04.2010 |
Click to download
Tender
Notice No.
T/PUB/2010/13
dtd. 24.02.2010.
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
1. |
Protection of river bank
at KGP end of Br. No.263 between Haldipada -Balasore under the
jurisdiction of ADEN /BLS.. |
89,75,019/- |
1,79,500/- |
5,000/- |
01.04.2010. |
|
2 |
Manning of un-manned level
crossing at Level Crossing No.14 (Km.19/13-15), 15 (Km.27/35-37), No.29
(Km.33/7-9), No.30 (Km.33/21-23) & No.40 (Km.46/1-3) on Kharagpur
Howrah section. |
43,72,759 /- |
87,460/- |
3,000/- |
01.04.2010. |
|
3. |
Improvement of circulating
area of Belda station under the jurisdiction of ADEN/ South/KGP. |
19,94,320/- |
39,890/- |
2,000/- |
25.03.10 |
Click to download
Tender
Notice No
T/PUB/2010/12
dtd. 17.02.2010.
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
|
1 |
Provision
of water Vats at Brishibpur, Nandai Gajan, Abada, Mourigram, Andul, Khirai,
Narayan Pakuria Murail, Bankra Nayabaz, Bargachia & Domjur and
Separate Toilet for Ladies and Gents at Tikapara, Abada, Nalpur,Fuleswar,
Brishibpur, Kulgachia, Nandai Gajan, Bankra Nayabaz,Shymachak,Madpur,
Kokpara, Asanboni, Girimaidan & Gokulpur stations |
34,30,833/- |
68,620/- |
3,000/- |
18.03.2010 |
|
|
2 |
Cover Shed
by space frame structure at Kharagpur. |
25,45,205/- |
50,910/- |
3,000/- |
18.03.2010 |
|
|
3 |
Construction of 1) one Dormitory for 6 bedded with toilet facility
separate for Ladies & Gents and
2nd class waiting Room and 2) Improvement of circulating area at
JER under the jurisdiction of
ADEN/S/KGP |
50,42,787/- |
|
5,000/- |
18.03.2010 |
|
|
4. |
Improvement
of circulating area at Soro station under the jurisdiction of ADEN/BLS. |
13,35,648/- |
26,720/- |
2,000/- |
18.03.2010 |
Click to download
Tender
Notice No
T/PUB/2010/
11 dtd. 16.02.2010 & Schedule
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
1 |
Provision of P.S Tank on existing staging in replacement of existing
damaged MS Plate / FRP Tank at Chakulia, Dhalbhumgarh, Ghatsila,
Rakhamines, Asanbon. |
28,02,319/- |
56,050/- |
3,000/- |
25.03.10 |
Click to download
Tender
Notice No.
T/PUB/2010/10
dtd. 10.02.2010. & Schedule
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
1 |
Repairs of
FOB structure, shed & deck as well as landing at BAC & BKNM,
repairs to station approach road by black top road, strengthening of
bridges at BAC & DJR stations and Misc. works at different stations in
SRC-AMZ. |
1,34,07,000/- |
2,17,040/- |
5,000/- |
04.03.2010 |
Click to download
Tender
Notice No.T/PUB/2010/09
dtd. 08.02.2010.
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
|
1 |
Metalising of triangulated (floor system of through type girder) of Br.
No. 215 Dn between JER-ARD station of KGP-BHC Section under XEN/Br. Line/KGP. |
73,77,512/- |
|
5,000/- |
18.03.2010 |
|
|
2 |
Sinking & fitting complete one
Deep Tube well of size 150x75 mm including
supply of submersible pump with electrical fitting & construction of
pump house at SEL & NPMR station
under the jurisdiction of Sr.DEN/East/KGP. |
16,70,687/- |
33,420/- |
2,000/- |
18.03.2010 |
|
|
3 |
Supply, Installation and commissioning of Electro
Chlorinator plants , Dosing pumps etc. at various stations in KGP-BHC
section including complete operation and maintenance of existing Electro
Chlorination plants under the jurisdiction of DEN/South/KGP. |
22,28,827
/- |
|
3,000/- |
18.03.2010 |
Click to download
Tender
Notice No.
T/PUB/2010/08
dtd. 25.01.2010
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening.
|
|
|
1 |
Construction of boundary wall ( 2000Mtr ) for
prevention of encroachment at different stations in between Tikiapara-
Santragachi under the
jurisdiction of ADEN/SRC.
|
60,55,647/- |
|
5,000/- |
04.03.2010 |
|
|
2 |
Construction of boundary wall (2000M) for
prevention of encroachment at different stations (Shalimar - 300 M,
Padmapukur - 500 M, Uiuberia
- 500M, Bagnan - 500M & Bauria 200M ) station under the
jurisdiction of ADEN/SHM.. |
54,73,445/- |
|
5,000/- |
04.03.2010 |
|
|
3. |
Platform
Fencing at Ghoraghata, Kolaghat, Nandaigajan, Narayan Pakuria Murail,
Khirai, Duan and Haur (PF No.1) stations |
46,81,319/- |
|
3,000/- |
04.03.2010 |
Click to download Tender Notice No. T/PUB/2010/07 dtd. 21.01.2010. & Schedule
|
Sl.
No. |
Description
of work |
Approx.
Value (Rs) |
Earnest
Money (Rs.) |
Cost
of Tender Form. |
Date
of opening. |
|
1 |
Supplying 50mm gauge hard stone machine crushed
ballast and loading the same into Railway's wagons / hoppers at F.O.R.
Pakur /Bakudih Depot for Kharagpur Division. (1,20,000 Cum).
|
6,08,40,000/- |
4,54,200/- |
10,000/- |
25.02.2010. |
Click to download
Tender
Notice No.
T/PUB/2010/06
dtd. 11.01.2010.
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
|
1 |
Dismantling and transportation of existing UC Span
(258'-0" long, weighing approx. 307.50 MT) over abandoned UP line of
Bridge No. 168 between NYA-VKD under the jurisdiction of ADEN/Br./KGP. |
61,75,523/- |
|
5,000/- |
18.02.2010 |
|
|
2 |
Renewal of chequered plates of bridges pathway and Trolley refuses over
Br. No. 17(MID & DN), Br. No. 35(UP), Br. No. 39(UP) , Br. No.
42(MID), Br. No. 51, Br. No. 58 (UP & DN ), Br. No. 59 (DN ),
Br. No. 67(UP , MID & DN), Br. No. 87(UP & DN), Br. No.
92(UP & DN), Br. No. 57(UP & DN), under Sr. DEN/E/KGP. |
1,80,88,080/- |
|
5,000/- |
18.02.2010 |
Click to download
Tender
Notice No.
T/PUB/2010/05
dtd. 08.01.2010.
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
|
1 |
Provision
of PF Shelter at Rajghat, Markona & Soro
under the jurisdiction of DEN/S/ KGP. |
27,62,991/- |
|
3,000/- |
04.02.2010 |
Click to download
Tender
Notice No.
T/PUB/2010/04
dtd. 08.01.2010.
|
Sl.
No. |
Description
of work |
Approx.
Value (Rs) |
Earnest
Money (Rs.) |
Cost
of Tender Form. |
Date
of opening. |
|
1 |
Manning of un-manned level
crossing at Level Crossing No.14(Km.19/13-15), 15 (Km.27/35-37), No.29
(Km.33/7-9), No.30(Km.33/21-23) & No.40(Km.46/1-3) on Kharagpur
Howrah section. |
43,72,759 /- |
87,460/- |
3,000/- |
18.02.2010. |
Click to download
Tender
Notice No.
T/PUB/2010/03
dtd. 07.01.2010.
|
Sl.
No. |
Description
of work |
Approx.
Value (Rs) |
Earnest
Money (Rs.) |
Cost
of Tender Form. |
Date
of opening. |
|
1 |
Repairs to roads in the
section of S.E (Works)/North- West /KGP under the jurisdiction of ADEN/Sett/KGP
( Next Phase for balance work
). |
1,55,19,046
/- |
2,11,040/- |
5,,000/- |
11.02.2010 |
|
2 |
Repairs for Track in SHM
& PDPK yard and provision of over Run Line/Dead end for line No.
1&2 at Padmapukur in Kharagpur Division . |
62,03,294/- |
1,24,070/- |
5,000/- |
11.02.2010 |
|
3 |
Renovation of AC shed, DLS,
IOH shed, Sick line and other service building. |
66,24,143/- |
1,32,490/- |
5,000/- |
11.02.2010 |
Click to download
Tender
Notice No.
T/PUB/2010/02
dtd. 01.01.2010.
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
|
1 |
Painting of rail by Anti-Corrosive Bituminous paint on UP line between
KGP and ROP in the jurisdiction of ADEN/South/KGP. |
52,89,560/- |
|
5,000/- |
11.02.2010 |
|
|
2 |
Painting of rail by Anti-Corrosive Bituminous paint on UP line between
ROP-BHC in the jurisdiction of ADEN/BLS. |
51,04,526/- |
|
5,000/- |
11.02.2010 |
Click to download
Tender
Notice No.
T/PUB/2010/01
dtd. 01.01.2010
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
|
1 |
Supply, Installation and commissioning of Electro Chlorinator
Plant & Dosing pumps etc. at Amta-1 No. , SRC South running
room-1 No. , SRC north Horizon 1 No., Chengail-1 No.,
Mecheda-1 No, PKU carshed 1 No. in HWH-KGP Section including
complete operation & maintenance of Electro Chlorination plant.
|
19,74,900/- |
|
2,000/- |
28.01.2010 |
|
|
2 |
Through Fastening renewal of 25.10km in patches
in KGP-BHC Section under the jurisdiction of DEN/S/KGP. |
8,13,571/- |
|
2,000/- |
28.01.2010 |
|
|
3 |
Through Weld renewal of 52kg/ 60kg rail in patches
in KGP-BHC Section under the jurisdiction of DEN/S/KGP. |
24,35,301/- |
48,710/- |
3,000/- |
28.01.2010 |
Click to download
Tender
Notice No.
T/PUB/2009/ 69 dtd. 28.12.2009.
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
1. |
Raising of Platform of 8 station on
SRC AMZ section under the jurisdiction of ADEN/SRC
( Balance work ). |
15,86,260/- |
31,730/- |
2,000/- |
28.01.2010 |
Click to download
Tender
Notice No.
T/PUB/2009/
68 dtd. 17.12.2009.
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
1. |
Painting of
60 Kg./ 52 Kg. rail by Anticorrosive Btuminous Paint on UP, DN & MID
under the jurisdiction of ADEN/SHM. |
61,08,311/- |
1,22,170/- |
5,000/- |
21.01.2010 |
Click to download
Tender
Notice No.
T/PUB/2009/
67 dtd. 17.12.2009.
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
1. |
Arrangement of water supply by sinking & fitting Deep Tube wells of
size 150x75 mm including supply of submersible pump with electrical
fitting, constr. Of pump house, pipe line & water vat at BAC
& DJR stations under the jurisdiction of Sr.DEN/East/KGP. |
17,37,586/- |
34,760/- |
2,000/- |
21.01.2010 |
|
2 |
Sinking & fitting complete one
Deep Tube well of size 150x75 mm including
supply of submersible pump with electrical fitting & construction of
pump house at SEL & NPMR station
under the jurisdiction of Sr.DEN/East/KGP. |
16,70,687/- |
33,420/- |
2,000/- |
21.01.2010 |
Click to download
Tender
Notice No.
T/PUB/2009/
66 dtd. 17.12.2009
|
Sl.
No. |
Description
of work |
Approx.
Value (Rs) |
Earnest
Money (Rs.) |
Cost
of Tender Form. |
Date
of opening. |
|
1 |
Execution
of Zonal works for the period upto 30.06.2010 in the section of : |
|
|
|
|
|
|
(i)S.E(Works)/South-II/
Kharagpur (from 7th street to South Inda/ Kharagpur). |
41,54,470/- |
83,090/- |
3,000/- |
21.01.2010 |
|
|
(ii) S.E(Works)/North-East/
Kharagpur |
29,11,693/- |
58,240/- |
3,000/- |
21.01.2010 |
|
|
(iii)S.E(Works)/North-West/
Kharagpur |
38,15,330/- |
76,310/- |
3,000/- |
21.01.2010 |
|
|
(iv) S.E(Works)/West/
Kharagpur. |
27,26,252/- |
54,530/- |
3,000/- |
21.01.2010 |
Click to download
Tender
Notice No.
T/PUB/2009/
65 dtd. 17.12.2009.
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
1 |
Remodeling of interiors and exteriors of
station building facade and passenger area Murals at Digha. |
7,27,891/- |
14,560/- |
2,000/- |
12.01.10 |
Click to download Tender Notice No. T/PUB/2009/ 64 dtd. 16.12.2009 & Schedule 1, 2, 3 & 4
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
|
1 |
Casual renewal of existing cracked concrete sleepers by new PSC
sleepers for 3800 nos under the jurisdiction of ADEN/BLS. |
10,88,157/- |
|
2,000/- |
21.01.2010 |
|
|
2 |
Provision of FOB connecting all platforms at BPE & VKD Station under
the jurisdiction of ADEN/S/KGP. |
53,55,584/- |
1,07,120/- |
5,000/- |
21.01.2010 |
|
|
3 |
Supply of 3 piece SKV / Welding Alumino Thirmit portions with all allied
materials with supervision for 2998 Nos. for welding of 52 Kg, 60Kg. rails
in Kharagpur - Bhadrak section under jurisdiction of DEN/South/KGP. |
43,65,041/- |
87,310/- |
3,000/- |
21.01.2010 |
|
|
4 |
Protection of electrical equipments and safety of works from rain water
by modifying existing louvers and allied works at ELS construction of new
E-4 room in place of existing E-4 room at Santragachi and special
Engineering works to shed extension, concreting & construction of one
room at Tikiapara. |
58,29,000/- |
1,16,580/- |
5,000/- |
21.01.2010 |
Click to download Tender Notice No. T/PUB/2009/63 dtd. 09.12.2009. , Schedule & Corrigendum
|
Sl.
No. |
Description
of work |
Approx.
Value (Rs) |
Earnest
Money (Rs.) |
Cost
of Tender Form. |
Date
of opening. |
|
1 |
Supplying 50mm gauge hard stone machine crushed
ballast and loading the same into Railway's wagons / hoppers at F.O.R.
Pakur /Bakudih Depot for Kharagpur Division.(1,00,370 Cum).
|
5,08,87,590/- |
4,04,440/- |
10,000/- |
14.01.2010. |
Click to download Tender Notice No.. T/PUB/2009/ 62dtd. 01.12.2009 & Schedule
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
1 |
Reconditioning of Tamping tools required for CSM-3X-3955, CSM-914 and
UNIMATE-8276 and other Tamping Machine working in kharagpur Division under
the jurisdiction of ADEN/TM/KGP. |
24,73,114/- |
49,470/- |
3,000 |
31.12.09 |
Click to download Tender Notice No.. T/PUB/2009/ 61dtd. 30.11.2009 & Schedule No.1 , 2 & 3
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
1 |
Construction of Armoury at RPF/ Zonal Training Institute and
Boundary wall ( 3800 m) for prevention of enchrochment at
Traffic Colony in Kharagpur Settlement under ADEN/Sett/KGP. |
1,36,12,925/- |
2,18,070/- |
5,000/- |
07.01.10 |
|
2. |
TRR(P)/(S)
of the existing SH 52kg 72UTS / 60Kg 72UTS rail laid on PSC - 5/PSC - 6
sleepers with SH 52kg 90UTS/ new 52kg / 60kg 90UTS(LWR) rails for Up
shunt,1st loop & R. Line 1& 2 at Santragachi yard, at Km.1.6 - 3.1
(Up) & 6.6 - 6.9 (Up) inbet. HWH - SRC,
10 Km. at different link lines of ACC Link and Casual rail renewal
of existing SH 52kg/90R/90LB rail with new 52kg 90UTS rails on common Loop
line No.2 & 3 of BVA yard under the jurisdiction of Sr.DEN/East/KGP |
27,02,105/- |
54,050/- |
3,000/- |
07.01.10 |
|
3. |
Through
Turnout Renewal of existing 52Kg /90R on wooden layout points &
crossing in passenger lines with new 52 Kg 1 in 8.5 / 1 in 12 curved
switches and CMS crossing on Fan shaped layout for I in 8.5 Pts & Xing
3 sets in BKNM, 1 in 12 Pts & Xing 5 Sets in SRC Yd ( East end ), 4
sts in MCA & 2 sets in HAU, 5 sets at ADL Yd & 2 sets at PKU, 6
sets at SGTY yd. under the jurisdiction of Sr.DEN/East/KGP. |
31,52,356 |
63,050/- |
3,000/- |
07.01.10 |
Click to download
Tender
Notice No.
T/PUB/2009/
60 dtd. 26.11.2009.
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
1 |
Extension & raising of PF no. 1 at JER by 206 m at KGP end
under the jurisdiction of ADEN/S/ KGP. |
43,72,593/- |
87,460/- |
3,000/- |
31.12.09 |
|
2 |
Placement 10 Ton, 3 Ton and 1 Ton capacity Truck for carrying Railway
Materials of South Eastern Railway, Kharagpur Division under the
jurisdiction of ADEN/SRC. |
7,60,553/- |
15,220/- |
2,000/- |
31.12.09 |
Click to download
Tender
Notice No.
T/PUB/2009/
59 dtd. 19.11.2009.
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
1 |
Through turnout renewal of
the existing 52 Kg /90 R 1 in 8.5 turnout on STO sleeper with new 52 Kg
Curved Switches and CMS X-ing on PSC layout for 73 sets at different
stations yard of KGP Division
under Sr. DEN/West/KGP. |
61,96,926/- |
1,23,940/- |
5,000/- |
24.12.09 |
Click to download Tender Notice No. T/PUB/2009/ 58 dtd. 17.11.2009 , Schedule 1 & 2 , Corrigendum
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
1 |
Casual Bridge Timber Renewal by steel Channel
Sleepers for 572Nos. of 6 bridges (Br.
No.278UP (66Nos.), Br. No.292UP (66Nos.), Br. No.315UP (66Nos.), Br.
No.332UP (154Nos.), Br. No.336UP (132Nos.) & Br. No.338UP (88Nos.)) in
Kharagpur - Bhadrak Section. |
98,72,681/- |
1,97,460/- |
5,000/- |
24.12.09 |
|
2 |
Provision of
PF Shelter at PF No. 1, 2 & 3/4 at Balasore station under the
jurisdiction of ADEN/BLS. |
69,20,532/- |
1,38,420/- |
5,000/- |
24.12.09 |
Click to download
Tender
Notice No.
T/PUB/2009/
57 dtd. 12.11.2009.
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
1 |
Erection of FOB at CKU and PF shelter in different station under the
jurisdiction of Sr. DEN/West/KGP. |
91,30,523/- |
1,82,610/- |
5,000/- |
21.12.09 |
Click to download
Tender
Notice No.
T/PUB/2009/
56 dtd. 10.11.2009.
|
Sl. No. |
Description of work |
Approx. Value (Rs) |
Earnest Money (Rs.) |
Cost of Tender Form. |
Date of opening. |
|
1 |
Through Bridge Timber Renewal of existing 600
Nos.of Bridge Timber by new Channel sleepers on Br. Nos.215(Up)(2 x 60'+11
x 150')G between Rajghat & Amarda Road station on , Kharagpur- Bhadrak
section. |
89,45,066/- |
1,78,910/- |
5,000/- |
17.12.09 |
TOP || ALL TENDER || HOME